imimperious2117 imimperious2117
  • 11-02-2021
  • Mathematics
contestada

Iii. A contractor hired 14 unskilled labourers to complete a job. It took 5 days for 20 men to complete the same job. How long will it take the hired labourers?

Respuesta :

sophia8833
sophia8833 sophia8833
  • 11-02-2021
The clock will tell you the time of how long it will take
Answer Link

Otras preguntas

Burning your tongue on hot toast is an example of heat transfer by: 1. radiation 2. conduction 3. convection 4. refraction
What is the impact of adding more light bulbs in parallel?
Aunt Alexandra shares a smile with Miss Maudie at the missionary circle because _____. she appreciates Miss Maudie's defense of Atticus she is trying to cover h
How did the mythical Amazons demonstrate their hatred of men?
Which statement about these two figures is true? A. The perimeter of A is greater than the perimeter of B. B. The perimeter of A is equal to the perimeter o
Which civilization developed in this part of the world during the classical era?
The primary _________ cortex specializes in recieving signals from different parts of the body. a. visual b. motorc. somatosensoryd. auditory
Which best describes a radioactive isotope? (A) An atom is unstable. (B)An atom is stable. (C)There is only one other isotope. (D)There are many isotopes
plz help me who can answer in 2 mins
Answer the question please