a contractor is mixing concrete and mixed 3 parts concrete and 9 parts water. How much water is needed for 12 parts concrete?

Respuesta :

sakie329 sakie329
  • 12-12-2018

Answer:

36 parts water

Step-by-step explanation:

3/9 = 1/3 = for every 1 part concrete, it's 3 parts water.

12/x = 1/3; x = 36

so, 12 x 3 = 36

Answer Link

Otras preguntas

Can producers function without sunlight?
evaluate 6x for each value of x. x = 2/3
calculate heat produced when 80000 coulombs of charge is transferred in 1/2 hour through a potential difference of 40 volts
The product of 5 and cube of x increased by the difference of 6 and x3?
Camille placed blocks on a table in rows and columns. All the rows and columns had the same number of blocks in them and formed a square. Which could be the tot
Question:Round the decimal to the nearest hundredth;then write it as a percentageProblem:0.098=___(rounded)=___(percentage) 0.3309 =___(rounded)=___(percentage)
What is Prime factorization of 153
evaluate 6x for each value of x. x = 2/3
Mark and Leonard went bird-watching. • Leonard saw 4 times as many red birds as Mark. • Leonard saw 28 red birds. Which equation could be used to find how m
Most nuclei contain a _______________ where ribosomes are made and partially assembled. The _______________ is fluid inside the cell membrane that surrounds th