s8510187 s8510187
  • 10-02-2020
  • SAT
contestada

In 9 days, a group of workers can plant 27 acres.
What is their rate in acres per day?

Respuesta :

princessbeckii
princessbeckii princessbeckii
  • 10-02-2020

Answer:

3 per day

Explanation:

This is because:

27 / 9 = 3

Answer Link

Otras preguntas

what is the mass of 1.0 l of water in grams?
every one of the 13 states had to ratify the articles of confederation before it became effective true or false
what geographic features in north america helped the exploration and colonization
How do black holes loose energy when they orbit each other in binary?
6.346 rounded to the whole number
a super train travels 1,500 miles in 12.5 hours. how many miles does it travel in one hour? 1487.50 1512.50 0.008 120
11. a person who has high cholesterol has a health condition that a. can be controlled only by eliminating all dairy products. b. requires a constant monitoring
what is the sum 3/5 3/7
What is 492.3069 rounded to nearest thousandth
Which of the following is an example of the commutative property? 2(5 - 3) = 10 - 6 14 + 18 + 6 = 14 + 6 + 18 27 + (3 + 9) = (27 + 3) + 9 4 + -4 = 0