jojothesavage1254 jojothesavage1254
  • 10-03-2020
  • Mathematics
contestada

A road crew can replace 1/30 miles of road rack hour. They must repave a road that 2/3 miles long. How long will it take the crew to repave the road

Respuesta :

kirablake7
kirablake7 kirablake7
  • 10-03-2020
It would take 12 hours to repave the road.
Answer Link

Otras preguntas

Many species can reproduce either asexually or sexually. What might be the evolutionary significance of the switch from asexual to sexual reproduction that occu
12. Which one of the following pairs of numbers contains like fractions? A. 4/8 and 12/16 B. 1/2 and 3/2 C. 8/7 and 60/70 D. 5/4 and 4/5
Order from least to greatest.
An opaque bag contains 5 green marbles, 3 blue marbles and 2 red marbles. If two marbles are drawn at random WITHOUT replacement, what is the probability of dra
3. What is 1/10 of 200?
If the United States makes demands of Syria who, in turn, makes their own demands of the United States, and both parties agree to make concessions where neither
Determine wether 16 is the perfect square show proof
Some types of cancers are caused by faulty genes. Scientists are researching methods for preventing and treating cancer with gene therapy. Which of the follo
A jet plane is cruising at 300 m/s when suddenly the pilot turns the engines up to full throttle. After traveling 4.0 km, the jet is moving with a speed of 400
Professor Srinivasan is a psychologist, yet she does not study cognition, thoughts, or feelings because she claims that they are not rooted in observable behavi