anacolin2004
anacolin2004 anacolin2004
  • 12-03-2020
  • Business
contestada

In order to minimize project risks, which step comes after the step of identifying risks?

In order to minimize project risks which step comes after the step of identifying risks class=

Respuesta :

nadanassif1997 nadanassif1997
  • 12-03-2020

Evaluating risks

Once risks are identified you determine the likelihood and consequence of each risk. You develop an understanding of the nature of the risk and its potential to affect project goals and objectives. This information is also input to your Project Risk Register.

Answer Link
elhooligan04
elhooligan04 elhooligan04
  • 05-05-2022

Answer:

The answer is A. Evaluating Risks

Explanation:

Answer Link

Otras preguntas

Evaluate the expression. −5 × (−8 − 6 ÷ −3)
What is the mRNA code formed from the 5'-3' strand of DNA with the code AAA GCA TTG AGC GGC? a AAA GCA TTG AGC GGC b UUU CGT UUC TCG GCG c GCC GCU CAA UGC UU
Piece of rope is 24 1/2 feet long how many 1/4 foot sections will there be?
Which option is an example of deductive reasoning?
A 0.940g sample of barium chloride is heated and 0.800g of anhydrous residue remains after cooling. How many moles of anhydrous barium chloride were present in
- Graph the image of ARST after a reflection over the line x = -3
What's the answer to 1 1/2 + 3/4
can some pls help me with this
Please post detailed answers Do you think the death penalty should be used? Why or why not? Do you think that capital punishment deters crime?
What is the difference of meiosis and mitosis?