abdul141097 abdul141097
  • 10-06-2020
  • Engineering
contestada

Scheduling can best be defined as the process used to determine:​

Respuesta :

racinglegend7
racinglegend7 racinglegend7
  • 10-06-2020

Answer:

Overall project duration

Explanation:

Scheduling can best be defined as the process used to determine a overall project duration.

Answer Link

Otras preguntas

A pen is being built that is 10 feet long and 20 feet wide. How much fencing material will be needed?
Assume that three weeks before you and lester are supposed to close your deal for the sale a twenty-acre tract of land, lester calls you and says, "the deal is
Water resources are finite, meaning that resources are
Read this excerpt from a commentary on the Venerable Bede, which appears in an introductory chapter of a translation of Bede's An Ecclesiastical History of the
What type of Figurative Language is this? “The sun in the West was a drop of burning gold that slid nearer and nearer the sill of the world”
will give brainiest if correct A. 69.1 B. 20.9 C. 22.4 D. 67.6
What were the goals of the doves and the hawks during the vietnam war?
Which could be the name of a line? A.R B. D C. m D. Rs
When upton signs the checks using someone else's name, this is the crime of:​ a. ​theft. b. ​uttering. c. ​check kiting. d. ​forgery?
Can you ask dog training questions or other than traditional school subjects?