grandemilenaa06 grandemilenaa06
  • 12-03-2021
  • Mathematics
contestada

if 9 men can complete a job in 4 days, how long will 8 men take to complete the same job, assuming that all the men are working at the same rate?

Respuesta :

irspow
irspow irspow
  • 12-03-2021

Answer:

Step-by-step explanation:

8t=9(4)

8t=36

t=4.5

So it will take 4.5 days for 8 men to finish the job.

Answer Link

Otras preguntas

Which is the most highly developed civilization:Olmec, Maya, Aztec, or inca
2.394 multiplied by 7.489
Which kind of sentence is this? Whose pink hat is on the floor A. declarative B. interrogative C. exclamatory D. imperative
Describe three ways the eruption of Mt. St. Helens changed the land.
sherman has 3 cats and 2 dogs. he wants to buy a toy for each of his pets. Sherman has $22 to spend on pet toys. how much can he spend on each pet? write your
what were some of the changes in Puritan society
Explain how the value of the 7 in 327,902 will change if you move it to the tens place
A population of rabbits triples every month. The population starts with two rabbits . How many rabbits are there after three months?
How can I solve h-17=-12
why were many arabs opposed to the balfour declaration