sharixiii8804 sharixiii8804
  • 11-01-2018
  • Mathematics
contestada

If six men can do a piece of work in 14 days. how many are needed to complete the project in 21 days

Respuesta :

Davidfridman
Davidfridman Davidfridman
  • 12-01-2018
you would need 9 poeple
Answer Link

Otras preguntas

Write 0.5 as a fraction in simplest form.
Which name was given to the Union's first ironclad vessel that revolutionized naval warfare? A. Hunley B. Monitor C. Merrimack D. Virginia
1 fourth B minus 10 equals 7
Read these lines from Robert Browning's "My last Duchess" "A heart - how shall I say?- too soon made glad, Too easily impressed; she liked whate'er, She look
Which of the following is not an effective way to manage forests and trees? a. planned harvesting b. planting replacements c. clearcutting d. soil maintenan
If the Kb of a weak base is 4.6 × 10-6, what is the pH of a 0.32 M solution of this base?
About thirty minutes after eating a seafood sampler at your restraunt, a customer complains of numbness in his mouth, dizziness, and an inability to move his ar
What term refers to a struggle on behalf of Islam? a. mosque b. Hijrah c. jihad d. mosaic b
At 5 seconds, an object's velocity is 9 meters per second. At 8 seconds, the object's velocity is 25 meters per second. Assuming a constant acceleration, what i
If you laid one of each size bolt end to end how long would the row of bolts be ?